Maintenance of infrastructures in hydroelectric plants
WORKS CARRIED OUT
- Replacement of cooling pipes for generator sets alternators;
- Elimination/Drainage of leaking water from the Sealing Board;
- Installation of the Water Drainage System;
- Renewal of the groups’ Cooling System;
- Modernization of the plant’s mechanical installation with the assembly of 4 vertical axis electric pumps for the plant’s sewage and drainage;
- Repair of the Groups Undrowsing System;
- Group 1 Power Destroyer Replacement;
- Improvement of the Mechanical Organs of the Group 1 Turbine;
- Replacement of the Piping and Isolation Valve of the Group’s by-pass Circuit;
- Renewal of the Groups’ Cooling System.